PHASE I CONSTRUCTION SCOPE KEENE ISD MASS GRADING AND ELEMENTARY CAFETERIA The design / build team shall provide design, construction, and project management services to: 1. Complete site grading and drainage improvements for the Keene ISD Field House in Keene, Texas. The proposed improvements shall conform to the Keene ISD Master Plan, dated May 27, 2015. Project elements include, but are not limited to, the following: • Clearing and grubbing of the project area. • Removal and relocation of security fencing. • Adjustment of existing utility appurtenances (fire hydrants, valve stacks, manholes, irrigation, etc.) • Storm sewer installation, including inlets and headwalls. • Site grading. Site fills shall be made in conformance with the recommendations included in the geotechnical investigation report. The building pad for the Field House shall be prepared according to the owner selected option contained in the geotechnical report. • Installation of the retaining wall along the northwest corner of the Field House parking lot. All other retaining walls shown on the Master Plan will be part of future phases of construction. • Provide erosion control measures during construction. Prepare and maintain a Storm Water Quality Pollution Prevention Plan (SWPPP). • Re-establish grass cover on all disturbed areas outside the limits of proposed paving and buildings. 2. Construction of a 2500 square foot addition to the elementary cafeteria • Architectual designs • Adjustment of existing utility appurtenances (fire hydrants, valve stacks, manholes, irrigation, grease pit, etc.) • Site grading for the building pad • Provide erosion control measures during construction. Prepare and maintain a Storm Water Quality Pollution Prevention Plan (SWPPP).
↧