The City of Rockwall Engineering Department, hereby gives notice of the Citys intent to revise the flood hazard information, generally located between Townsend Drive and F.M. 3549. Specifically, the flood hazard information shall be revised along Buffalo Creek from a point approximately 1,540 feet downstream of John King Boulevard to a point approximately 2,330 feet upstream of John King Boulevard. As a result of the revision, the 1% annual chance water-surface elevations shall be established, and the 1% annual chance floodplain shall be widened and narrowed within the area of revision. Maps and detailed analysis of the revision can be reviewed at the City of Rockwall Engineering Department at 385 South Goliad, Rockwall, Texas 75087. Interested persons may call the Assistant City Engineer at 972-771-7746 for additional information from 8 a.m. to 5 p.m. Monday through Friday.
↧